We now have a hire schedule for Day & Zimmerman for work at Diablo Canyon:
JW DispatchReport
15Thursday, Sept 10Monday Sept 14
15Monday, Sept 14Tuesday Sept 15
15Tuesday, Sept 15WednesdaySept.16
15Wednesday, Sept 16ThursdaySept 17
These are the dates we have at this time. This schedule and the number of hires can and probably will change. Check the "Job Calls" tab on this website or the Jobline Recorder at:
805.543.5693 ext 41 AFTER 6PM
The estimated start date for the Unit 2 Outage at Diablo Canyon Nuclear Power Plant is Oct 5, 2009 and is currently scheduled to run 29 days.
Day and Zimmerman NPS expects to hire around 70 80. First hire is scheduled for mid July then every week in August Updated schedule calls for hiring to start second week in Augustand into September.
Base Schedule is 4-10s, Monday - Thursday until the outage starts then 6-10s with two shifts.
Work at a Nuclear Power plant requires drug testing, 3 year work history, credit and criminal back ground check. Extensive computer based testing takes place on site, after hire in. For more information and test study material go to http://www.pge.com/microsite/diablo/ PLEASE BE AWARE THAT THIS SITE IS FROM THE LAST OUTAGE AND SOME INFORMATION NO LONGER APPLIES. THE SGT IS NO LONGER ON SITE AND WILL NOT BE HIRING.
THE PHQS ARE NOT CURRENT ON THIS SITE
JW scale is $32.20, Please go to ibew.org Construction Job Board for more information.
Calls will be listed on the jobline no later than the night before dispatch.The job line at 805-543-5693, extension 41.
Local 639 has an in-person dispatch, we cannot forecast the likelihood of your catching a call, you need to be on the out of work list and present at dispatch.
CA certification is not required at DiabloCanyon
The most current information including hire dates and the number on the books, will be updated on the Construction Jobs Board at ibew.orgSpecific hire dates will be posted as they become available.
-