The estimated start date for the Unit 2 Outage at Diablo Canyon Nuclear Power Plant is Oct 3, 2009 and is currently scheduled to run 29 days.
We do not have hire dates or numbers at this time. Day and Zimmerman NPS typically hires four to six weeks prior to the start of the Outage.
Base Schedule is 4-10s, Monday - Thursday until the outage starts and then go 6-10s with two shifts.
Work at a Nuclear Power plant requires drug testing, 3 year work history, credit and criminal back ground check. Extensive computer based testing takes place on site, after hire in. For more information and test study material go to http://www.pge.com/microsite/diablo/. PLEASE BE AWARE THAT THIS SITE IS FROM THE LAST OUTAGE AND SOME INFORMATION NO LONGER APPLIES. THE SGT IS NO LONGER ON SITE AND WILL NOT BE HIRING.
JW scale is $32.20, Please go to ibew.org Construction Job Board for more information.
Calls will be listed on the jobline no later than the night before dispatch. The job line at 805-543-5693, extension 41.
Local 639 has an in-person dispatch, we cannot forecast the likelihood of your catching a call, you need to be on the out of work list and present at dispatch.
CA certification is not required at Diablo Canyon
The most current information including hire dates and the number on the books, will be updated on the Construction Jobs Board at ibew.org Specific hire dates will be posted as they become available.